Details


SMDI #
2765
Current Showing Name
Boundary Dam Mine
Historical Showing Names
Boundary Dam Mine
Company Name
Project Name
UTM Easting (NAD83 Z13)
643750.0000
UTM Northing (NAD83 Z13)
5440045.0000
NTS Sheet
062E03
TRM (Township-Range-Meridian)
02-08-2
Primary Commodities
Coal
Associated Commodities
Discovery Type
Status
Deposit: Post-Production
Geological Details
Estevan Coal Basin. Paleocene Ravenscrag Formation. Core location: 31,32,33-1-8-W2 & 3,5,6,7,8-2-8-W2. 5.8 million tonnes produced in 2011. Surface drag-line stripping operation. Contract with Saskatchewan Power Corporation. Includes original Boundary Dam Mine (33-1-8-W2; 3-2-8-W2) and Utility Mine (31,32-1-8-W2; 5,6,7,8-2-8-W2) land holdings.
Geological Domain
Weyburn
Host Rocks
Host Minerals
Indicators
Exploration History
5/30/2013
Production History
Reserves and/or Resources
1978-01-01 Historical coal resources for the Estevan Coal Basin documented in Irvine et al. (1978). Summary: Estevan Coal Basin: Historic reserve (unspecified) - Coal